change language Winterkonservierung
Service Products Information Trainings Contact About us Impress
Home Service Winter preservation

Service


Planning Installation Winter preservation Feed water pretreatment Legionella Prevention Water treatment of cooling circuits Chilled water and heating systems



Winterkonservierung

Winter preservation

The cooling treatment of water products used in the summer term, offer a comprehensive protection from corrosion and deposits only during the operating time of the circulations. If the plants are emptied to the winter, the anti-corrosion protection also disappears with the cooling water in the channel. The atmospheric oxygen has in addition the possibility now among emptied lines of reacting in the system. It therefore can without corresponding precautions, too considerable corrosion, in the winter months

Circulations in winter

Empty system cooling tower from syringes completely, and clean, then fill the system newly. Occurring to 1:250 related to the system volume into the cooling tower proportionally at a running circulating pump GEWA AI 640. Letting circulating pump go approx. 5 - 6 hours. Emptying system completely again

Systems which are emptied only to frost limit

Empty system cooling tower from syringes completely, and clean, then fill the system newly. At running circulating pump GEWA AI 640 of proportionally 1: 250 and GEWA B 352 of proportionally 1:2000, respectively related to the system volume, fill into the cooling tower. Letting circulating pump go approx. 5 - 6 hours. Letting down system water-level to under the frost limit. Emptying completely and filling newly system before return to service